Guarantee continuous production of drinking water for Oran and the surrounding region
In the early 2000's, the supply, treatment and distribution of drinking water had become so critical in Algeria that the government decided to implement firm actions. Oran and its surrounding region were amongst the priority zones. Due to an insufficiency of underground water sources, water had to be transferred from the Cheliff dam for treatment.
560,000
m3
Treat water with a methodology based on efficient processes
SUEZ worked alongside the National Dams and Transfer Agency on one the largest national hydraulic projects: construction, development and operation of the Sidi Lahdjel drinking water production plant. As the second largest such site in Algeria, it supplies several cities in including Mostagenem, Arsem, Oran (MAO) and their regions.
Within a short time, SUEZ was able to develop a water treatment line to deliver high throughput, and implement efficient installations at all phases
Upstream of the Sidi Lahdjel plant, raw water from the Cheliff dam is subject to specific treatment at a de-sludging plant designed by SUEZ teams. 820,800 m3 /day are then aerated, clarified and filtered prior to final disinfection. SUEZ equipped the Sidi Lahdjel plant with innovative processes, in particular Densadeg® 2D clarifiers (high settling rate, water quality) and 18 Aquazur® V sand filters each with a surface area of 151.4 m2.
The result
The Sidi Lahdjel treatment plant delivers 561,600 m3 of drinking water per day. Sufficient to provide relief for Mostaganem-Arsem and Oran and ease their water scarcity.